Process Optimization
Through collaboration, identify area-requiring adjustment to reduce or eliminate Non-Productive Time (NPT) caused by drilling fluids or waste management. These areas are not limited to losses circulation, circulating to condition mud or solid control efficiency resulting in over dilution. By providing a daily fluid and solid control audits while building a checklist of key indicator we create a systematic approach to eliminate or reduce costly NPT and in turn optimizing the drilling operation.